Ball Mill For Gold Mine In Zimbabwe

The mine is based on 100ha and has a strike length of over 1,5km, there are two reefs parallel to each other workings prior to 1938 were done down to 170mt over a average reef width of 1,5mt and a recovery of 5.4gt there are over 120 000 ton of old dumps grading at over 0.8gt custom milling tailings run at over 2,5gt recovered.

Get Price

Latest News

Copyright © .Henan Antek Mining Machinery Co., ltd. All rights reserved. Sitemap